Construction Scheduling Coordinator - Washington, Federal Way

Construction Scheduling CoordinatorPermanent

Washington, Federal Way - 98003
  • Applications 0
  • Post Date: 2022-10-22
  • Views 639
  • Job Categories:Construction
  • Job Type:Permanent
  • Published Date:2022-10-22
  • Salary Period:Annual
  • Company Name:Lennar Homes
  • Company Type:Agency

Job Simplification

The announced job offer is made public by the firm: Lennar Homes and it was included in jobs list the date of: 2022-10-22 in the website greenenergyjobsonline.com.

It is announced that they have a job offer at the category of Construction and the jobs location is in the state of Washington at the city Federal Way, in the country US - at this current ZipCode: 98003

The information residing in this page is not directly announced by our websites, we help users in the intent of finding the jobs they want and redirect them back to jobs8 for apropriate applying to any of the jobs listed on www.greenenergyjobsonline.com.

Construction worker

People who perform manual labor as unskilled or semi-skilled laborers are considered employed. In the United Kingdom, a construction worker is defined as someone who works for or under the control of a contractor on a construction site. They can also be skilled tradespeople or managerial and supervisory personnel. In Canada, anyone who supervises other workers or enforces regulations and building codes may be labeled an inspector.

The word "laborer" refers to a specific job type and level in most construction industries. It's a generic term that defines a large group of workers in almost every national construction industry. In the United States, over 7.5 million people work in construction — including 820,000 laborers — with 573,000 carpenters, 508,000 electricians, 258,000 equipment operators and 230,000 construction managers. The United States Department of Labor reports 681,000 white-collar workers employed in construction. These people work in office and administrative support occupations. Most construction companies hire office and administrative support workers.

Job Overview

Overview

Responsible for field and vendor schedule adherence and all scheduling tasks of the division in support for the resource planning activities.


Responsibilities

  • Expedite and prioritize resource schedules and maintain schedule templates for the division.
  • Provide real time support to the field for re-schedules.
  • Monitor schedules and communicate delays while working with trade partners to resolve scheduling issues.
  • Monitor BuildPro/SupplyPro usage and take proactive measures to ensure division wide compliance.
  • Support, trouble shoot, and maintain BuildPro/SupplyPro systems.
  • Work alongside CSM to ensure schedule accuracy's correlate with the field, and ensure construction staff are reporting accurate real-time schedules
  • Assist Permits Coordinator with all BuildPro/SupplyPro document entry and SOP's.
  • Participate with the RPM in all defect/recordable tracking and scheduling of trade partner process improvement plan meetings.
  • Perform field audits to ensure scheduling process is working and quality is being delivered.
  • Work with trade partners to verify the trades capacity and ensure trade is not overbooked to ensure no bottlenecks and missed tasks.
  • Daily communication with CSM's, TP's, CM's, RPM, DOC, along with Associates and other outside entities. External contacts where the matters discussed require some resourcefulness, patience and clarity.
  • Perform all other duties as assigned.

Qualifications

EDUCATION AND ADDITIONAL REQUIREMENTS:

  • Minimum high school diploma or equivalent required. Associates degree preferred
  • Minimum 3 years' experience in construction industry
  • 1+ year current experience in BuildPro/SupplyPro systems preferred
  • Preferred to have had experience as a construction manager or equivalent job
  • Must possess professional attitude to represent the company in a positive manner
  • Valid Driver's License with good driving record
  • Valid Auto insurance coverage
  • Advanced PC skills, Microsoft Word, Excel, and JD Edwards
  • Excellent follow-up, communication (written and verbal) and time management skills
  • Able to simultaneously perform multiple detail-oriented tasks with little oversight
  • Must have a good understanding of the construction process and how the scheduled tasks interact with each other

PHYSICAL REQUIREMENTS:

This is primarily a sedentary office position which requires the ability to occasionally bend, stoop, reach, lift, move and carry office supplies weighing 25 pounds or less. Finger dexterity is required to operate computer keyboard, calculator, and telephone equipment


Type

Regular Full-Time
Apply This Job

Employer Overview

Lennar Homes

Washington, Federal Way - 98003
  • Agency