Construction Scheduling Coordinator - Ontario (ON), Toronto

Construction Scheduling CoordinatorPermanent

Ontario (ON), Toronto - M3C
  • Applications 0
  • Post Date: 2022-10-22
  • Views 130
  • Job Categories:Construction
  • Job Type:Permanent
  • Published Date:2022-10-22
  • Salary Period:Annual
  • Company Name:Minto Group
  • Company Type:Agency

Job Simplification

The announced job offer is made public by the firm: Minto Group and it was included in jobs list the date of: 2022-10-22 in the website greenenergyjobsonline.com.

It is announced that they have a job offer at the category of Construction and the jobs location is in the state of Ontario (ON) at the city Toronto, in the country CA - at this current ZipCode: M3C

The information residing in this page is not directly announced by our websites, we help users in the intent of finding the jobs they want and redirect them back to jobs8 for apropriate applying to any of the jobs listed on www.greenenergyjobsonline.com.

Construction worker

People who perform manual labor as unskilled or semi-skilled laborers are considered employed. In the United Kingdom, a construction worker is defined as someone who works for or under the control of a contractor on a construction site. They can also be skilled tradespeople or managerial and supervisory personnel. In Canada, anyone who supervises other workers or enforces regulations and building codes may be labeled an inspector.

The word "laborer" refers to a specific job type and level in most construction industries. It's a generic term that defines a large group of workers in almost every national construction industry. In the United States, over 7.5 million people work in construction — including 820,000 laborers — with 573,000 carpenters, 508,000 electricians, 258,000 equipment operators and 230,000 construction managers. The United States Department of Labor reports 681,000 white-collar workers employed in construction. These people work in office and administrative support occupations. Most construction companies hire office and administrative support workers.

Job Overview

Construction Scheduling Coordinator (Low-rise & Mid-rise Residential)

Minto Communities Canada (Estimating & Purchasing, Low-rise & Mid-rise)

Minto Toronto Head Office (4101 Yonge Street, Suite 600)

The Opportunity:

Reporting to the Director of Contract Operations, the Scheduling Coordinator is responsible for creating, coordinating, monitoring, and reporting of construction schedules using NEWSTAR and other scheduling tools as required.

What you'll be responsible for day to day:

  • Assist in preparation and updating of baseline schedules and setup lots and lot schedules into NEWSTAR for each project.
  • Assist in preparation of Low Rise Project Production Schedule Report.
  • Coordinate & ensure schedule updates are done in a timely manner.
  • Assist in preparation of Baseline vs. Actual Construction Schedule Reports.
  • Assist in preparation and tracking of Construction Status Reports.
  • Analyze Historical Construction Data as required.
  • Assist in uploading cost data to NEWSTAR for construction releases.
  • Support on NEWSTAR Vendor link queries from the trade partners as needed.
  • Other duties within the scope, spirit and purpose of the job, as requested by management.

Who we are looking for:

Education: Project Management and any construction related certification is desired.

Experience: Experienced in working with Excel is required. A minimum of 3+ years of experience in construction scheduling is required. Experience in integrated scheduling in NEWSTAR and NEWSTAR Vendor link is desired.

Specialized Skills, Knowledge and Abilities:

  • Microsoft Office (Word, Intermediate Excel and Outlook)
  • Experience with MS Project desired
  • Experience with NEWSTAR highly desired
  • Understands concept of Project Management specifically in the area of construction scheduling
  • Detail Oriented and Accurate
  • Skilled in analytical problem solving
  • Ability to work independently and as part of a team
  • Exceptional time management and organization skills

Minto is an equal opportunity employer committed to fostering an inclusive and accessible environment. We are dedicated to building a workforce that reflects the diversity of the community in which we live, including those with disabilities. Should you require accommodation or support in any aspect of our recruitment and selection process, we will work with you to meet your needs.

Apply This Job

Employer Overview

Minto Group

Ontario (ON), Toronto - M3C
  • Agency